Timber staircase with dark treads against a white wall
← All servicesStairs

Staircases & Landings

Stairs prepped and finished to match your floors, including spindles, risers and nosings.

What you get with this job

  • Treads, risers, nosings, spindles and handrails prepped to match your floors
  • Extra care on nosings and edges, the parts of a staircase that wear fastest
  • Non-slip finish options for treads where safety matters
  • Landing floors finished to flow seamlessly from the stairs
  • Dust-controlled prep on a part of the home that's hard to isolate

Our process for this job

Assess Treads & Spindles

Every tread, riser and spindle checked before work starts.

Dust-Controlled Prep

Extraction equipment used throughout, even on a tight stairwell.

Detail Work

Extra attention on nosings and edges, where stairs wear fastest.

Matching Finish

Colour-matched to your existing floors, wherever possible.

Finish options for this floor

A few starting points below. See all six on the finishes guide.

Close-up of warm, matte natural oak grain
Soft, even sheen of light catching a satin-lacquered floor
Close-up of near-black dark walnut wood grain

See All 6 Finishes

Staircases: good to know

Can stairs be finished to match floors done at a different time?
Yes, we colour-match new stair finishes to existing floors, even if the floors were done separately or by someone else.
Is there a non-slip option for treads?
Yes, ask about a non-slip additive or finish for treads, particularly useful on bare or lacquered stairs.
How long does a staircase take?
Most staircases take 1–2 days including prep and finish drying time. We'll give you an exact timeline with your written quote.

Get a free quote for your staircases job

Tell us a little about your floor. We’ll come back to you, usually within one working day.